Brand-new industrial flex buildings coming to Spokane Valley’s rapidly expanding industrial corridor. Located at 4524 N. Barker Rd, Phase 2 offers two 20,400 SFT buildings available now with flexible layouts, 18’ clear height, six 12’x12’ overhead doors, and 1600A 240V 3-phase power per building. Each steel-constructed building will be fully insulated and sprinkled, with office buildout options, fenced yard space (2–4 acres available for qualified tenants), and dedicated parking. Positioned near I-90, the Barker Logistics Center, Selkirk Industrial Park, and the Spokane Business & Industrial Park, this site provides unmatched connectivity and visibility in one of the region’s most active industrial hubs.