New flex/warehouse building currently under construction. Estimated completion date and newly paved parking lot is scheduled for completion in Summer 2025. Overhead door sizes: 16’h x 14w. Power available - connections include both 208V single-phase and three-phase options, with designated circuits sized between 20A and 60A. 4 allotted parking spaces with capacity overflow capacity (39 total including van-accessible ADA Stalls) + access to Future EV Charging Stations.